No.
|
Job Description
|
Year
|
|
01
|
LIVE & DEAD LINE WASHING OV OVERHEAD LINE INSULATORS IN DHANK
|
2007
|
|
02
|
EXTENSION OF11KV O/H LINE
|
2007
|
|
03
|
LIVE & DEAD LINE WASHING OF OVERHEAD LINE INSULATORS (11) IN AL DAKHLIYA REGION
|
2009
|
|
04
|
ELECTRICAL DIST.WORKS (11 KV & 33KVNETWORK FROM KUMZAR TO GHARAM
|
2008
|
|
05
|
EXT. OF 11KV O/H LINE FROM HABBALAYAN TO AL BOOT AT KHASAB IN MUSANDAM GOVERNORATE
|
2007
|
|
06
|
ELECTRICAL DISTRIBUTION WORKS (HT/LT NETWORKS EXTENSIONS) AT AL BALAD VILLAGE IN MUSANDAM
|
2008
|
|
07
|
INSTALLATION OF DIST. S/S FOR THE RESIDENTIAL PLANNED IN ENSOOR AT DIBBA IN MUSANDAM REGION
|
2008
|
|
08
|
CONST. OF 11 KV O/H LINE TO GIVE P/S TO SIND VILLAGE IN RUSTAQ AREA
|
2009
|
|
09
|
ELECTRICAL DISTRIBUTION WORKS (11KV NETWORK EXTENSIONS) TO FEED POWER SUPPLY AT MUSANAA
|
2009
|
|
10
|
ELECTRICAL DISTRIBUTION WORKS (11 KV NETWORK EXTENSIONS) AT AL RAHBA, AL WASHIHI, AL ZEEDI AND AK BULAIDA AREAS IN WILAYAT MUDHAIBI SHARQIYA REGION
|
2009
|
|
11
|
LIVE & DEAD LINE WASHING OF 11KV NETWORK REINFORCEMENT AT BATNA REGION
|
2009
|
|
12
|
REINFORCEMENT WORKS AT THE EXISTING 33KV LINE AND PRIMARY SUBSTATION AT ASWAD IN IBRI IN DHAHIRAH REGION
|
2007
|
|
13
|
CONSTRUCTION OF 11KV DISTRIBUTION NETWORKS TO GIVE P/ TO THE INDUSTRIAL AREA AT NIZWA IN DAKHLIA REGION
|
2009
|
|
14
|
REINFORCEMENT WORKS AT THE EXISTING HT AND LT NETWORK IN DAKHLIAYA REGION
|
2009
|
|
15
|
INSTALLATION OF DIST. S/S FOR THE RESIDENTIAL PLANNED IN KARSHA AT DIBBA IN MUSANDAM REGION
|
2008
|
|
16
|
ELECTRICAL DISTRIBUTION WORKS (11KV NETWORK EXTENSIONS) AT AWABI
|
2009
|
|
17
|
REPLACEMENT OF POST & DISC INSULATORS WITH SILICON RUBBER INSULATORS AT AL JERRY FEEDER IN IBRI
|
2009
|